Apr 26, 2011

First Outside Pour of 2011

 Still too soft to get a concrete truck on the yard so we got a pumper.

 The step is prepped and waiting for concrete.

 Here I took a pic while I was screeding the top pad of the front step.

 The first float is almost complete.

 We also poured the back patio for the walkout basement.

Stephane is stamping our old granite texture on the patio. Tomorrow we will strip and wash the patio and step. Finished pics should be up next week.

Apr 16, 2011

Kitchen with Integral Drainboard

This kitchen features a reverse cove edge profile and an integral slot drainboard. There will be a huge stainless apron front sink for this kitchen. Check back soon for finished pictures.



Apr 13, 2011

Washroom Counters

This is the ensuite counter with double vessel sinks. Notice the cool brick wall behind the tub.

This is the main bath. No brick walls in this room but still a nice washroom.

Finished Pics of GFRC Kitchen

Finished kitchen picture. Concrete tops for the main cabinets and a butcher block for the island.

The brick wall/backsplash really finishes the kitchen.


Apr 4, 2011

Bar Top

This is a integral bar sink with a floating bar top. One of the coolest back splashes I have seen lately.

Check out that floating bar top.